600x150x46 rubber track for MK120 MK120S MK140 MK140S MST160 MST160S MST180
The Troubles of Crawler Tracked Dumper Owners:
- Direct OEM Replacement: Ensures longer service life for your Morooka equipment.
- Superior Traction: Enhances performance on extreme terrains like mud and forests.
- Reduce Cost Per Hour: Enhanced durability reduces maintenance expenses.
- Customizable Specifications: Tailored to fit specific Morooka models and needs.
- International Manufacturing: Quality assured with ISO9001 standards.
- Applicable Models: Rubber Track 600x150x46 for MK120 MK120S MK140 MK140S MST160 MST160S MST180 MOROOKA Crawler Tracked Dumper.
Quick Details
| Condition: | 100% New |
| Applicable Industries: | For Yanmar C80R Rubber Track |
| Video outgoing-inspection: | Provided |
| Brand Name: | YIKANG |
| Place of Origin | Jiangsu, China |
| Weight | 995 KGS |
| Model Number | 600x150x46 Rubber Track |
| Warranty: | 1 Year or 1000 Working Hours |
| Certification | ISO9001:2015 |
| Color | Black |
| Supply Type | OEM/ODM Custom Service |
| Material | Rubber & Steel |
| MOQ | 1 PC |
Core Selling Points for Morooka Rubber Track:
Complete Custom Design: Every chassis is engineered from scratch based on your machine's weight, dimensions, and specific work conditions, ensuring a perfect fit and optimal performance.
Proven Global Application: Our chassis have been reliably operating in demanding markets like Australia, Europe, and North America, demonstrating exceptional adaptability and durability.
Direct Factory Collaboration: Work directly with our engineering team for technical discussions and design reviews, ensuring your requirements are accurately translated into the final product.
Extreme Load Capacity: Built to withstand heavy loads from 10 to over 100 tons, providing a solid and stable foundation for the most demanding industrial machinery.
Dedicated Project Management: You will have a single point of contact who coordinates engineering, production, and quality control throughout your order process.
Warranty Period:YIJIANG offers 12 months or 1000 working hours quality guarantee.
As your trusted partner, we respond rapidly anywhere to ensure your machines never stop operating.
What Model is Your Crawler Tracked Dumper?
Zhenjiang Yijiang can customize various track specifications for Crawler Tracked Dumper , the length can be adjusted to meet your needs.
1. Contact us with your machine model.
2. Get a confirmed fit and a competitive quote within 24 hours.
3. Receive expert support from order to operation.
| Zhenjiang Yijiang Machinery Co.,Ltd. | |||
| manager@crawlerundercarriage.com WhatsApp:+86 13862448768 | |||
| Track Sizing Guide for MOROOKA | |||
| Model Of Carrier | Width | Pitch | Links |
| MST 300 | 350 | 100 | 53 |
| MST300VD | 350 | 100 | 53 |
| MST 450 | 350 | 100 | 58 |
| MST 500 | 450 | 100 | 65 |
| MST 550 | 600 | 100 | 80 |
| MST 600 | 500 | 90 | 78 |
| MST600E | 500 | 90 | 78 |
| MST 600VD | 500 | 100 | 65 |
| MST700 Wide | 600 | 100 | 76 |
| CG45/RG60/C60R/LD400 | 600 | 125 | 64 |
| MST800 / MST800VD | 600 | 100 | 80 |
| MST1100 / MST1100E / CG45-2 | 700 | 100 | 80 |
| CG45-2 | 700 | 100 | 98 |
| MST1500 / MST1500VD | 700 | 100 | 98 |
| MST 1700 / IC70 / CG65 | 700 | 100 | 98 |
| MST 1800 / CG70 | 650 | 125 | 80 |
| MST 1900 | 700 | 100 | 98 |
| MST 2000 | 800 | 125 | 80 |
| MST2200 / MST2200 VD | 750 | 150 | 66 |
| MST 2300 / IC100 / CG100 / CG110 | 750 | 150 | 66 |
| MST 2500 | 900 | 150 | 74 |
| MST 2600 | 900 | 150 | 68 |
| MST 3000 VD | 800 | 150 | 66 |
| MST 3000 | 800 | 150 | 66 |
| MST 3300 | 1000 | 150 | 86 |
| MST3300 V / VD | 900 | 150 | 74 |
Application Scenarios
A one-stop purchasing experience can save you trouble and reduce machine downtime, thereby creating greater value for you.
Packaging & Delivery
YIKANG rubber track packing: Bare package or Standard wooden pallet.
Port : Shanghai or Customer requirements.
Mode of Transportation: ocean shipping, air freight, land transportation.
If you finish the payment today, your order will ship out within the delivery date.
| Quantity(sets) | 1 - 1 | 2 - 100 | >100 |
| Est. Time(days) | 20 | 30 | To be negotiated |
Phone:
E-mail:















