Professional Design Tracked Chassis With Rubber Tracks - Custom rubber track undercarriage for carrying 1-15 ton crawler excavator drilling rig – YIJIANG
Professional Design Tracked Chassis With Rubber Tracks - Custom rubber track undercarriage for carrying 1-15 ton crawler excavator drilling rig – YIJIANG Detail:
Product Details
The crawler undercarriage is the second most widely used walking system after tire type in construction machinery. Commonly used are: mobile crushing and screening machines, drilling rigs, excavators, paving machines, etc.
Good possibility. The crawler undercarriage adopts crawler, the grounding length can reach 4m to 6m, the grounding area is large, and the grounding specific pressure is small; and there are generally thorns on the crawler board, which has strong gripping ability and can maneuver in grassland, desert, jungle, and swamp environments; The Idler position is high and can pass obstacles such as trenches, vertical walls, etc
| Condition: | New |
| Applicable Industries: | Crawler Machinery |
| Video outgoing-inspection: | Provided |
| Place of Origin | Jiangsu, China |
| Brand Name | YIKANG |
| Warranty: | 1 Year or 1000 Hours |
| Certification | ISO9001:2019 |
| Load Capacity | 1 –15Tons |
| Travelling Speed (Km/h) | 0-2.5 |
| Undercarriage Dimensions(L*W*H)(mm) | 2250x300x535 |
| Color | Black or Custom Color |
| Supply Type | OEM/ODM Custom Service |
| Material | Steel |
| MOQ | 1 |
| Price: | Negotiation |
Standard Specification / Chassis Parameters
| Type |
Parameters(mm) |
Track Varieties |
Bearing(Kg) |
||||
|
A(length) |
B(center distance) |
C(total width) |
D(width of track) |
E (height) |
|||
| SJ080 | 1240 | 940 | 900 | 180 | 300 | rubber track | 800 |
| SJ050 | 1200 | 900 | 900 | 150 | 300 | rubber track | 500 |
| SJ100 | 1380 | 1080 | 1000 | 180 | 320 | rubber track | 1000 |
| SJ150 | 1550 | 1240 | 1000 | 200 | 350 | rubber track | 1300-1500 |
| SJ200 | 1850 | 1490 | 1300 | 250 | 400 | rubber track | 1500-2000 |
| SJ250 | 1930 | 1570 | 1300 | 250 | 450 | rubber track | 2000-2500 |
| SJ300A | 2030 | 1500 | 1600 | 300 | 480 | rubber track | 3000-4000 |
| SJ400A | 2166 | 1636 | 1750 | 300 | 520 | rubber track | 4000-5000 |
| SJ500A | 2250 | 1720 | 1800 | 300 | 535 | rubber track | 5000-6000 |
| SJ700A | 2812 | 2282 | 1850 | 350 | 580 | rubber track | 6000-7000 |
| SJ800A | 2880 | 2350 | 1850 | 400 | 580 | rubber track | 7000-8000 |
| SJ1000A | 3500 | 3202 | 2200 | 400 | 650 | rubber track | 9000-10000 |
| SJ1500A | 3800 | 3802 | 2200 | 500 | 700 | rubber track | 13000-15000 |
Application Scenarios
Packaging & Delivery
One- Stop Solution
Product detail pictures:
Related Product Guide:
Fast and great quotations, informed advisers to help you choose the correct solution that suits all your requirements, a short creation time, responsible high quality manage and distinct providers for paying and shipping affairs for Professional Design Tracked Chassis With Rubber Tracks - Custom rubber track undercarriage for carrying 1-15 ton crawler excavator drilling rig – YIJIANG , The product will supply to all over the world, such as: Portland, Netherlands, Poland, During in 11 years, We have participated in more than 20 exhibitions, obtains the high praise from each customer. Our company has been devoting that customer first and committed to helping customers expand their business, so that they become the Big Boss !
The company can think what our think, the urgency of urgency to act in the interests of our position, can be said this is a responsible company, we had a happy cooperation!
Phone:
E-mail:










