Short Lead Time for Crawler Rubber Track Platform - Custom rubber track undercarriage for carrying 1-15 ton crawler excavator drilling rig – YIJIANG
Short Lead Time for Crawler Rubber Track Platform - Custom rubber track undercarriage for carrying 1-15 ton crawler excavator drilling rig – YIJIANG Detail:
Product Details
The crawler undercarriage is the second most widely used walking system after tire type in construction machinery. Commonly used are: mobile crushing and screening machines, drilling rigs, excavators, paving machines, etc.
Good possibility. The crawler undercarriage adopts crawler, the grounding length can reach 4m to 6m, the grounding area is large, and the grounding specific pressure is small; and there are generally thorns on the crawler board, which has strong gripping ability and can maneuver in grassland, desert, jungle, and swamp environments; The Idler position is high and can pass obstacles such as trenches, vertical walls, etc
| Condition: | New |
| Applicable Industries: | Crawler Machinery |
| Video outgoing-inspection: | Provided |
| Place of Origin | Jiangsu, China |
| Brand Name | YIKANG |
| Warranty: | 1 Year or 1000 Hours |
| Certification | ISO9001:2019 |
| Load Capacity | 1 –15Tons |
| Travelling Speed (Km/h) | 0-2.5 |
| Undercarriage Dimensions(L*W*H)(mm) | 2250x300x535 |
| Color | Black or Custom Color |
| Supply Type | OEM/ODM Custom Service |
| Material | Steel |
| MOQ | 1 |
| Price: | Negotiation |
Standard Specification / Chassis Parameters
| Type |
Parameters(mm) |
Track Varieties |
Bearing(Kg) |
||||
|
A(length) |
B(center distance) |
C(total width) |
D(width of track) |
E (height) |
|||
| SJ080 | 1240 | 940 | 900 | 180 | 300 | rubber track | 800 |
| SJ050 | 1200 | 900 | 900 | 150 | 300 | rubber track | 500 |
| SJ100 | 1380 | 1080 | 1000 | 180 | 320 | rubber track | 1000 |
| SJ150 | 1550 | 1240 | 1000 | 200 | 350 | rubber track | 1300-1500 |
| SJ200 | 1850 | 1490 | 1300 | 250 | 400 | rubber track | 1500-2000 |
| SJ250 | 1930 | 1570 | 1300 | 250 | 450 | rubber track | 2000-2500 |
| SJ300A | 2030 | 1500 | 1600 | 300 | 480 | rubber track | 3000-4000 |
| SJ400A | 2166 | 1636 | 1750 | 300 | 520 | rubber track | 4000-5000 |
| SJ500A | 2250 | 1720 | 1800 | 300 | 535 | rubber track | 5000-6000 |
| SJ700A | 2812 | 2282 | 1850 | 350 | 580 | rubber track | 6000-7000 |
| SJ800A | 2880 | 2350 | 1850 | 400 | 580 | rubber track | 7000-8000 |
| SJ1000A | 3500 | 3202 | 2200 | 400 | 650 | rubber track | 9000-10000 |
| SJ1500A | 3800 | 3802 | 2200 | 500 | 700 | rubber track | 13000-15000 |
Application Scenarios
Packaging & Delivery
One- Stop Solution
Product detail pictures:
Related Product Guide:
We constantly continually give you essentially conscientious client provider, plus the widest variety of designs and styles with high quality materials. These initiatives include the availability of customized designs with speed and dispatch for Short Lead Time for Crawler Rubber Track Platform - Custom rubber track undercarriage for carrying 1-15 ton crawler excavator drilling rig – YIJIANG , The product will supply to all over the world, such as: Vietnam, Slovakia, London, Adhering to the management tenet of Managing Sincerely, Winning by Quality, we try our to provide excellent products and service to our clients. We look forward to making progress together with domestic and international clients.
We are a small company that has just started, but we get the company leader's attention and gave us a lot of help. Hope we can make progress together!










