Short Lead Time for Crawler Rubber Track Platform - Custom rubber track undercarriage for carrying 1-15 ton crawler excavator drilling rig – YIJIANG
Short Lead Time for Crawler Rubber Track Platform - Custom rubber track undercarriage for carrying 1-15 ton crawler excavator drilling rig – YIJIANG Detail:
Product Details
The crawler undercarriage is the second most widely used walking system after tire type in construction machinery. Commonly used are: mobile crushing and screening machines, drilling rigs, excavators, paving machines, etc.
Good possibility. The crawler undercarriage adopts crawler, the grounding length can reach 4m to 6m, the grounding area is large, and the grounding specific pressure is small; and there are generally thorns on the crawler board, which has strong gripping ability and can maneuver in grassland, desert, jungle, and swamp environments; The Idler position is high and can pass obstacles such as trenches, vertical walls, etc
Condition: | New |
Applicable Industries: | Crawler Machinery |
Video outgoing-inspection: | Provided |
Place of Origin | Jiangsu, China |
Brand Name | YIKANG |
Warranty: | 1 Year or 1000 Hours |
Certification | ISO9001:2019 |
Load Capacity | 1 –15Tons |
Travelling Speed (Km/h) | 0-2.5 |
Undercarriage Dimensions(L*W*H)(mm) | 2250x300x535 |
Color | Black or Custom Color |
Supply Type | OEM/ODM Custom Service |
Material | Steel |
MOQ | 1 |
Price: | Negotiation |
Standard Specification / Chassis Parameters
Type |
Parameters(mm) |
Track Varieties |
Bearing(Kg) |
||||
A(length) |
B(center distance) |
C(total width) |
D(width of track) |
E (height) |
|||
SJ080 | 1240 | 940 | 900 | 180 | 300 | rubber track | 800 |
SJ050 | 1200 | 900 | 900 | 150 | 300 | rubber track | 500 |
SJ100 | 1380 | 1080 | 1000 | 180 | 320 | rubber track | 1000 |
SJ150 | 1550 | 1240 | 1000 | 200 | 350 | rubber track | 1300-1500 |
SJ200 | 1850 | 1490 | 1300 | 250 | 400 | rubber track | 1500-2000 |
SJ250 | 1930 | 1570 | 1300 | 250 | 450 | rubber track | 2000-2500 |
SJ300A | 2030 | 1500 | 1600 | 300 | 480 | rubber track | 3000-4000 |
SJ400A | 2166 | 1636 | 1750 | 300 | 520 | rubber track | 4000-5000 |
SJ500A | 2250 | 1720 | 1800 | 300 | 535 | rubber track | 5000-6000 |
SJ700A | 2812 | 2282 | 1850 | 350 | 580 | rubber track | 6000-7000 |
SJ800A | 2880 | 2350 | 1850 | 400 | 580 | rubber track | 7000-8000 |
SJ1000A | 3500 | 3202 | 2200 | 400 | 650 | rubber track | 9000-10000 |
SJ1500A | 3800 | 3802 | 2200 | 500 | 700 | rubber track | 13000-15000 |
Application Scenarios
Packaging & Delivery
One- Stop Solution
Product detail pictures:



Related Product Guide:
We've been proud with the significant shopper fulfillment and wide acceptance due to our persistent pursuit of front end of range both of those on solution and repair for Short Lead Time for Crawler Rubber Track Platform - Custom rubber track undercarriage for carrying 1-15 ton crawler excavator drilling rig – YIJIANG , The product will supply to all over the world, such as: Rio de Janeiro, Netherlands, Zimbabwe, The development of our company not only needs the guarantee of quality, reasonable price and perfect service, but also relies on our customer's trust and support! In the future, we are going to continue with qualified and high quality service to offer competitive price, Together with our customers and achieve win-win! Welcome to inquiry and consult!

We are old friends, the company's product quality has been always very good and this time the price is also very cheap.
