Short Lead Time for Crawler Rubber Track Platform - Custom rubber track undercarriage for carrying 1-15 ton crawler excavator drilling rig – YIJIANG
Short Lead Time for Crawler Rubber Track Platform - Custom rubber track undercarriage for carrying 1-15 ton crawler excavator drilling rig – YIJIANG Detail:
Product Details
The crawler undercarriage is the second most widely used walking system after tire type in construction machinery. Commonly used are: mobile crushing and screening machines, drilling rigs, excavators, paving machines, etc.
Good possibility. The crawler undercarriage adopts crawler, the grounding length can reach 4m to 6m, the grounding area is large, and the grounding specific pressure is small; and there are generally thorns on the crawler board, which has strong gripping ability and can maneuver in grassland, desert, jungle, and swamp environments; The Idler position is high and can pass obstacles such as trenches, vertical walls, etc
| Condition: | New |
| Applicable Industries: | Crawler Machinery |
| Video outgoing-inspection: | Provided |
| Place of Origin | Jiangsu, China |
| Brand Name | YIKANG |
| Warranty: | 1 Year or 1000 Hours |
| Certification | ISO9001:2019 |
| Load Capacity | 1 –15Tons |
| Travelling Speed (Km/h) | 0-2.5 |
| Undercarriage Dimensions(L*W*H)(mm) | 2250x300x535 |
| Color | Black or Custom Color |
| Supply Type | OEM/ODM Custom Service |
| Material | Steel |
| MOQ | 1 |
| Price: | Negotiation |
Standard Specification / Chassis Parameters
| Type |
Parameters(mm) |
Track Varieties |
Bearing(Kg) |
||||
|
A(length) |
B(center distance) |
C(total width) |
D(width of track) |
E (height) |
|||
| SJ080 | 1240 | 940 | 900 | 180 | 300 | rubber track | 800 |
| SJ050 | 1200 | 900 | 900 | 150 | 300 | rubber track | 500 |
| SJ100 | 1380 | 1080 | 1000 | 180 | 320 | rubber track | 1000 |
| SJ150 | 1550 | 1240 | 1000 | 200 | 350 | rubber track | 1300-1500 |
| SJ200 | 1850 | 1490 | 1300 | 250 | 400 | rubber track | 1500-2000 |
| SJ250 | 1930 | 1570 | 1300 | 250 | 450 | rubber track | 2000-2500 |
| SJ300A | 2030 | 1500 | 1600 | 300 | 480 | rubber track | 3000-4000 |
| SJ400A | 2166 | 1636 | 1750 | 300 | 520 | rubber track | 4000-5000 |
| SJ500A | 2250 | 1720 | 1800 | 300 | 535 | rubber track | 5000-6000 |
| SJ700A | 2812 | 2282 | 1850 | 350 | 580 | rubber track | 6000-7000 |
| SJ800A | 2880 | 2350 | 1850 | 400 | 580 | rubber track | 7000-8000 |
| SJ1000A | 3500 | 3202 | 2200 | 400 | 650 | rubber track | 9000-10000 |
| SJ1500A | 3800 | 3802 | 2200 | 500 | 700 | rubber track | 13000-15000 |
Application Scenarios
Packaging & Delivery
One- Stop Solution
Product detail pictures:
Related Product Guide:
As for aggressive costs, we believe that you will be searching far and wide for anything that can beat us. We can state with absolute certainty that for such high-quality at such rates we have been the lowest around for Short Lead Time for Crawler Rubber Track Platform - Custom rubber track undercarriage for carrying 1-15 ton crawler excavator drilling rig – YIJIANG , The product will supply to all over the world, such as: United Arab emirates, Morocco, Los Angeles, Meanwhile, we're building up and consummating triangle market & strategic cooperation in order to achieve a multi-win trade supply chain to expand our market vertically and horizontally for a brighter prospects. development. Our philosophy is to create cost-effective products and solutions, promote perfect services, cooperate for long-term and mutual benefits, firm a in depth mode of excellent suppliers system and marketing agents, brand strategic cooperation sales system.
This is the first business after our company establish, products and services are very satisfying, we have a good start, we hope to cooperate continuous in the future!
Phone:
E-mail:










